Our Projects

Our projects showcase the results of our industry-specific expertise and specialized services. We partner with clients across sectors like environment, infrastructure, and sustainable development.

Project Portfolio

Solar-Powered Water Supply and Irrigation Systems — Call-off 3

Feasibility studies, preliminary design and detailed engineering design for 11 sites under call-off 3 of the MWE solar-powered water supply and irrigation programme. This assignment covers Bukomansimbi, Buliisa, Kagadi, Kakumiro, Kassanda, Kikuube, Luweero, Lwengo and Mubende, including sizing of solar energy packages.

Karamoja Drought Resilience — Livelihood Restoration and Land Acquisition

Preparation of a livelihood restoration and resettlement action plan and support to secure land for water-for-production infrastructure in the Nangololapolon cluster, Kotido and Kaabong districts. QL works in joint venture with JBN under national guidelines and World Bank ESS5.

Tilenga Power Generation, LPG Recovery and Emergency Flare ESIA

Environmental and social impact assessment for power generation, LPG recovery and the emergency flare system at the Tilenga Central Processing Facility. The assessment covers environmental and social impacts, health and safety, security risks and mitigation measures.

Tilenga Polymer Flooding Environmental Risk Assessment

Update of the environmental risk assessment for polymer flooding to enhance oil recovery from the Jobi Rii field of the Tilenga Project. The assignment reviews previous studies, operating conditions, health risks, toxicology, environmental fate and emergency response measures.

Tilenga House Cracks and Socio-Economic Baseline Study

Baseline study of households around Ngiri 3 and Gunya 1 well pads in the Tilenga Project area. The assignment assesses structural integrity and cracks in buildings within 200 metres of well pads, alongside socio-economic conditions and potential impacts from drilling and construction.

Strategic Environmental Assessment of Uganda’s Nuclear Power Programme

Strategic Environmental Assessment of Uganda’s Nuclear Power Programme, undertaken with Air Water Earth and ELARD. The assessment addresses siting, technology, plant lifecycle, radioactive waste, security, emergency preparedness and supporting infrastructure.